• Components of the athletic stadium fields are beginning to be put in place. Most recently, the goal post foundations, pole vault pad, steeplechase area and long jump areas were installed.

     

    Additionally, approximately 1,330 feet of trench drain for the track was installed, 500 additional feet of drainage trench was installed and approximately 500 yards of topsoil was screened and placed.